COMPANY: Adrem Engineering
Domain: Natural Gas – Automation and security
Client: SNTGN TRANSGAZ SA
PROJECT DESCRIPTION:
WORK DURATION: the initial term was 4 months, but it was extended due to changes in the initial technical solution and unfavorable weather conditions. Final term, 7 months.
ALLOCATED STAFF: 4 teams (design, execution, electrical connections, automation)
WORK LOCATION: Caraș Severin County – JUPA locality
OBSTACLES: The assembly and construction works were very difficult due to the variable weather conditions, with abundant rainfall throughout the year.
Final work: 04.10.2021