BUILDING MANAGEMENT SYSTEM (BMS SYSTEM) – VOLKSBANK BUCHAREST – Adrem

BUILDING MANAGEMENT SYSTEM (BMS SYSTEM) – VOLKSBANK BUCHAREST

Design and execution

Project type: Design and execution works

 

Description: A BMS solution (HVAC installations, normal low voltage and lighting consumers) for the head office of Volksbank Romania – the Nusco Centre Building, in Bucharest

The solution allows controlling and monitoring each floor, for the purpose of optimizing consumption and extending the operating life of the equipment.

 

Implementation:
The implemented BMS system controls the following circuits:

  • • lighting pertaining to office spaces, traffic hallways and restrooms
  • • low voltage for general use (kitchens, restrooms, multifunctional, water equipment, paper shredders, etc.)
  • • fan coils serving these spaces

It runs control scenarios concerning certain consumers (for example: if it detects movement in an area outside the service window, then the BMS turns on the light in the area for “x” minutes).

Poze proiect