DOMAIN: Electricity Distribution
CLIENT: S.C. DELGAZ GRID S.A
CONSTRUCTOR: ADREM INVEST (leader) and SC MION ELECTRO CONSULT SRL and SC ENERGOFANEX SRL
PROJECT DESCRIPTION:
LEA 20 kV Tg. Ocna – Salina was put into operation in the 1970s and as a result of the wear and tear of the line elements, work was required to maintain or restore the technical condition.
According to the design theme, the following were executed:
- works to replace existing insulation with composite type insulation,
- 375 insulators and 825 stretch chains
- installation works new separators,
- 5 dividers with related consoles
- concrete structure repair works, painting, existing pillars,
- painting 142 consoles
- painting 3 trellis posts
- works to replace poles that present functional problems,
- MT poles – 11 pieces
- wooden portal posts type A with concrete portal posts 2x Sc 15015 above crossing the river Slanic
- wooden portal posts type A with tubular metal posts 2x SMT 18-2500 overpass DN 12A
- inscription works on LEA 20 kV Tg poles. Ocna – Salina
- 180 poles
- works to remove some equipment to the public domain, for access
- Public release of PTA 8 Tg. Ocna, to create access with replacement and installation of a new PTA
WORK DURATION: The 12-month contract deadline was exceeded with the beneficiary’s agreement, due to the change in the project theme as well as the limited number of possible annual interruptions.
OBSTACLES ENCOUNTERED: The difficulty of the work consisted in the location of the existing MV line in the geographical mountain area, with a network executed 30 years ago in public domains and transformed over time in private domains.
As exceptional works, the project team realized:
- replacing wooden poles type A with 2 portal poles type 2xSMT 18-2500 (tubular metal poles) for the crossing of the DN12A national road and executed the diversion of the related MV overhead line – almost unique work on MV networks in the Moldova Region
- replacement of wooden portal posts type A with concrete portal posts 2x Sc 15015 over the Slanic river crossing
BENEFITS for the CLIENT/ COMMUNITY: Insulation replacement work is required to maintain the 20 kV LEA at normal safe operating parameters.