INTEGRATED AUTOMATION AND SCADA SYSTEM FOR POWER PLANT (WASTE EXHAUST) – Adrem

INTEGRATED AUTOMATION AND SCADA SYSTEM FOR POWER PLANT (WASTE EXHAUST)

Energetic

AES MARITZA IZTOK, BULGARIA

 

FIELD:
Energy Industry

 

DESCRIPTION:
Automation of the industrial process by implementing a SCADA system for the plant waste exhaust belts

 

Dispatch Centres: 1 dispatch centre

 

No. of RTUs/ Local points: 2

 

No. of process variables: 2.000

 

General contractor/ “Turnkey” solution: Specialised subcontractor