AES MARITZA IZTOK, BULGARIA
FIELD:
Energy Industry
DESCRIPTION:
Automation of the industrial process by implementing a SCADA system for the plant waste exhaust belts
Dispatch Centres: 1 dispatch centre
No. of RTUs/ Local points: 2
No. of process variables: 2.000
General contractor/ “Turnkey” solution: Specialised subcontractor